Skip to content

Bathroom Remodeling in the Baltimore Area

We remodel bathrooms in Baltimore City, Baltimore County and nearby Howard and Anne Arundel, covering tear-out, repairs behind the walls, waterproofing, tile, vanities and fixtures. Every tiled tub and shower wall goes up over cement board and a liquid waterproofing membrane.

5.0 on Google (28 reviews)Updated October 2026

Bathroom with a white double vanity, black fixtures and a frameless glass walk-in shower

What the job includes

  • Full tear-out to studs and subfloor, with rot and old framing repaired before anything new goes in
  • Cement board and a liquid waterproofing membrane behind every tiled tub and shower wall
  • Tile tub surrounds, walk-in showers, niches and accent walls, laid out so cuts land in the corners
  • Vanities, tops, mirrors, lighting, glass doors and fixtures installed and adjusted
  • Half baths and powder rooms as well as full and primary bathrooms
  • Daily cleanup and one point of contact from estimate to walkthrough
Picture it before you remodelUpload a photo of your bathroom, pick a style and see a free AI concept of the finished space.

What does a Solomon bathroom remodel include?

A full Solomon bathroom remodel runs from demolition through the final walkthrough. We remove the old tile, tub or shower, vanity and flooring, open the walls and floor where needed, and repair what we find. Then we rebuild in order: framing and blocking, backer board, waterproofing, tile, vanity and top, fixtures, glass, lighting, paint and trim.

On tiled tub and shower walls we install cement backer board and roll on a liquid waterproofing membrane before the first tile goes up. That membrane keeps water out of the wall cavity. Without it, tile can look fine for years while the wall behind it rots. Our leaf-tile bathroom is a tub surround tiled over that membrane.

Wide view of a bathroom gutted to the studs Installer setting tile over red waterproofing membrane

Older rowhouse and county bathrooms

Older bathrooms in Baltimore rowhouses and Baltimore County homes tend to need work below the finishes. Floors slope and supply lines are often old galvanized pipe. Tubs sit on framing that has been wet for decades, and a narrow stairwell can make carrying a vanity upstairs a project of its own. We look for all of this at the estimate so it’s in the scope from the start.

Narrow rowhouse bathrooms also reward good layout decisions. A long vanity on one wall, a tub or shower across the end, and a glass enclosure instead of a curtain can make a 5-foot-wide room feel open. Our navy-vanity bathroom started as a fully gutted room with cement board on the walls. It ended with a marble-top vanity, gold fixtures, a glass walk-in shower and a wood-look tile floor.

Remodeled bathroom with navy vanity, gold fixtures and glass shower Remodeled bathroom with long vanity and sliding glass tub doors

How do you tile a shower or tub surround?

We set tile over a flat, waterproofed backer and plan the layout before the first piece goes up, so cuts land in the corners. On large-format tile we use leveling clips to keep the surface flat. We’ve installed large-format marble-look tile, patterned accent walls, subway tile and wood-look plank tile.

Bathroom mid-remodel with leveling clips on blue marble-look wall tile and a white hex tile floor Tub with black-framed sliding glass doors and blue marble-look tile with a recessed niche

Choices we’ve installed recently include:

  • Patterned accent walls behind the tub, with plain tile on the side walls to keep the look calm
  • Marble-look porcelain tub surrounds with matte black fixtures and trim
  • Wood-look plank tile floors that handle water better than real wood (see flooring installation for floor prep)
  • Recessed niches built into the framing so shampoo bottles stay off the tub ledge

Vanity, fixtures and the final walkthrough

Once tile is done, the vanity and top go in. The faucet, toilet, mirrors, lighting and glass doors follow. Plumbing and electrical permits are pulled by licensed plumbers and electricians, as the law requires. Our guide to bathroom remodel permits in Baltimore explains which work needs which permit in the City and the County.

White vanity with an arched black mirror and vanity light on blue marble-look tile Tub with sliding glass doors and leaf-pattern tile wall

Before we leave, we adjust the glass doors so they close without drag and check that faucets don’t drip and the toilet sits solid. Paint, caulk and trim are the last step. For the City’s bathroom permit rules in a table, see our Baltimore City bathroom remodeling page.

What affects the cost of a bathroom remodel?

Scope sets the cost of a bathroom remodel, and size comes second. A full gut with new waterproofing and floor-to-ceiling tile is a different job from new fixtures in the same footprint, and moving the toilet, tub or shower adds plumbing work. The main drivers:

  • What’s behind the walls. Rotted subfloor, wet framing or old galvanized lines found at demolition add repair work.
  • Layout changes. Moving a drain or adding a fixture means new plumbing, and in Baltimore City it’s an alteration that needs floor plans.
  • Tile area and pattern. Full-height tile, niches, accent walls and large-format tile take more labor than a plain surround.
  • Fixtures and glass. Vanity, faucet and shower-door choices vary widely, and you can supply your own.
  • Permits. Plumbing and electrical permits are part of the job wherever fixtures are replaced or moved.
  • Access. A third-floor rowhouse bathroom up a narrow stair takes longer to tear out and stock.

We give a written price after the site visit, once we’ve seen the room and the plumbing.

Do you remodel half baths and powder rooms?

Yes, we remodel half baths and powder rooms. Swapping a dated powder room vanity or retiling a half-bath floor is often a few days of work, and so is putting new fixtures and paint in a hall bath. Permits still apply to the fixtures in a small room, as they do in a full bathroom (Baltimore County PAI).

A small bathroom is also a good way to see how we work before you plan a bigger project, such as a whole-floor renovation.

Recent bathroom work

  • Remodeled bathroom with marble-look tile tub surround and matte black fixtures
  • Bathroom with blue marble-look tile and a tub with black-framed glass doors
  • Remodeled powder room with wood vanity
  • Large-format tile being installed around a soaking tub
  • Remodeled bathroom with toilet and glass-door tub in blue marble-look tile

Before & after

After: Before and after of a bathroom remodel with navy vanityBefore: Before and after of a bathroom remodel with navy vanity
Before and after of a bathroom remodel with navy vanity

What homeowners say

“I had a great experience with Solomon Construction and Remodeling. They did an excellent job renovating my bathroom, and I’m very happy with how everything turned out. The quality of the work was excellent, they paid attention to the details, and the whole process was handled professionally. The team was reliable, respectful, and easy to work with. They truly cared about doing the job right, and the finished bathroom looks amazing. I would definitely recommend Solomon Construction and Remodeling to anyone looking for quality remodeling work. Great job from start to finish!🙏🙏🙏”

Yosef B. · Google review, September 2026

“Excellent work. Professional and knowledgeable! They did a great job with my bathroom. Highly recommended!!! Thank you”

Z & L · Google review, October 2026

“Highly recommend this company. They do excellent work and are very knowledgeable when it comes to decks, kitchens, and bathroom renovations. Everything is handled professionally, the workmanship is clean, and they pay attention to the details that make a big difference in the finished project. If you’re looking for a reliable general contractor for a deck, kitchen remodel, bathroom renovation, or other home improvement project, they’re definitely worth calling.”

Gad B. · Google review, August 2026

Bathroom Remodeling: common questions

How long does a bathroom remodel take?

A full gut-and-rebuild of a standard bathroom usually takes a few weeks of work once materials are on site. Tile work and any repairs we find behind the walls are the biggest variables. You get a written schedule with your estimate, and we tell you right away if opening the walls changes it.

Do I need a permit to remodel a bathroom in Baltimore?

Most bathroom remodels need at least plumbing and electrical permits, and the rules differ between the City and the County. Baltimore City requires a permit to replace plumbing or electrical fixtures even in the same spot, though tile, cabinets and paint alone don't need one. Baltimore County needs no building permit for a residential bathroom, but plumbing and electrical permits are always required. Confirm for your address.

Can I keep my tub, or should I switch to a walk-in shower?

Both are common. A tub with a tiled surround and glass doors keeps the room flexible for families and resale, and a walk-in shower with a glass enclosure makes a small rowhouse bathroom feel bigger and is easier to step into. We'll walk through what fits your layout and plumbing at the estimate.

What happens if you find water damage behind the walls?

In older Baltimore homes it's common to find soft subfloor, rotted framing or old leaks once the tile comes off. We show you what we found with photos, explain the fix and what it adds to the job, and get your approval before doing any extra work.

Can you match a specific tile or vanity I picked out?

Yes, you can choose your own tile, vanity and fixtures, or we can suggest options that fit the budget and the room. We confirm sizes and rough-in locations before demolition so everything fits when it arrives.

Permit offices in our service area

Permit rules differ by jurisdiction and change over time. Confirm requirements for your address with the office above.

Tell us what you need done.

Estimates are free. Text a few photos to the number below and we can usually tell you what the job involves before we even come out.

Sun–Thu 8am–8pm · Fri 8am–4pm · Sat closed