Skip to content

Pressure-Treated Deck and Ramp Rebuild in Baltimore

A worn wood deck and long entry ramp on a two-story Baltimore home, rebuilt with new pressure-treated boards, joists, railings and steps. Finished in November 2026.

New pressure-treated deck with steps and railings on a two-story home

What the deck and ramp needed

This two-story Baltimore home has a long wood ramp that runs along the house from the front walkway up to a deck outside the entry door. Years outdoors had turned the boards dark and mossy, and the railings were worn along the whole run.

How we rebuilt it

We started by taking the old boards and railings off, which opened up the frame underneath. We added new pressure-treated joists where the frame needed them, along with new rim boards around the outside. The frame is what decides whether a deck needs new boards, a repair or a full rebuild, and our decks and porches page explains how we make that call.

With the frame ready, we laid new boards across the deck and down the length of the ramp. New posts went on next, bolted through to the frame, and the railings run from post to post along both structures.

The old steps came off the back of the deck. We built the new ones in a different spot, at the corner, with the steps and railing set in concrete. Our exterior stairs page covers this kind of work in more detail.

How the finished deck works

Deck, ramp, railings and steps are all the same pressure-treated lumber, so they read as one structure from the yard. The ramp still gives a step-free route from the walkway to the door, and the new steps lead from the deck down to the yard.

Photos from this job

After: New pressure-treated deck and railings outside an entry doorBefore: Old deck with dark, mossy boards and worn railings
New pressure-treated deck and railings outside an entry door
Wide view of a new pressure-treated deck with railings
Old weathered wood ramp with railings along the side of a house
Old deck railings and rim seen from the yard
New pressure-treated joists added to a deck frame at an entry door
Ramp frame with new joists and rim board before the boards go on
New deck boards and railing posts bolted to the deck frame
New deck boards with a crew member and the company van in the background
New stair stringers and posts being set at the corner of a deck
New pressure-treated steps and handrail posts at the corner of a deck

Want results like this?

Estimates are free. Text a few photos to the number below and we can usually tell you what the job involves before we even come out.

Sun–Thu 8am–8pm · Fri 8am–4pm · Sat closed